GetFinancialSolutions.com
  • Investing News
  • Stock News
  • World News
  • Business News
Investing News

Ore Reserve Quadruples for Rhyolite Ridge Project; Reaffirms Robust Project Economics

by June 2, 2025
June 2, 2025

Ioneer Ltd (ASX: INR, Nasdaq: IONR) (Ioneer) is pleased to announce a 308% upgrade to the Ore Reserve estimate for its 100%-owned Rhyolite Ridge Lithium-Boron Project (‘Rhyolite Ridge’ or the ‘Project’) in Nevada, USA, alongside updated Project economics.

Rhyolite Ridge Ore Reserve more than quadrupled from 60 million tonnes in 2020 to 247 million tonnes, delivering a mine life of 95 years
Ore Reserve now contains a total of 1.92 Mt of lithium carbonate equivalent and 7.68 Mt of boric acid equivalent
Underpinning plans for a large, long-life, low-cost expandable operation, producing lithium carbonate, boric acid and then battery-grade lithium hydroxide
Stable co-product – boric acid accounts for an average 25% of annual revenue in the first 25 years; helping ensure positive EBITDA at low lithium prices and EBITDA margin of 65.7% based on average production over first 25 years
All-in sustaining cash cost of US$5,745 per metric tonne lithium carbonate equivalent places the Rhyolite Ridge Project in the bottom of the global lithium cost curve
Compelling Project economics with an after-tax NPV of US$1.367 billion, and an unlevered, after-tax internal rate of return (IRR) of 14.5%

The Ore Reserve has increased by 186.6 million tonnes (Mt) and approximately 48% of the Mineral Resource has been converted into Reserve, now estimated at:

246.6 Mt at 1,464 ppm lithium and 5,444 ppm boron
Containing 1.92 Mt of Lithium Carbonate Equivalent (LCE) and 7.68 Mt of Boric Acid Equivalent (BAE)

“Today’s updated Reserve and Mine Plan reinforces the importance of Rhyolite Ridge’s remarkable mineralogy. Our Ore Reserve estimate of 247 Mt containing a total of 1.92 Mt LCE and 7.68 Mt BAE make it the largest lithium-boron Reserve in the world,” said Bernard Rowe, Managing Director, Ioneer. “It allows Ioneer to match prevailing market conditions and blend or prioritise ore to produce a valuable boric acid co- product, whose market is uncorrelated with the Project’s primary lithium product. No other lithium project offers this level of flexibility and economic advantage. In periods of low cycle lithium pricing, like today, we plan to prioritize the high-boron ore production to optimize the relative proportion of total revenue derived from boric acid.”

By prioritising High-Boron (Hi-B) ore in the first 25 years of production, the Project is poised to produce an average of ~19,200 tonnes per annum (tpa) of LCE, and 116,400 tpa of boric acid (see Table 1).

The updated Ore Reserve estimate, 95-year mine plan for stage one operations, and Project economics reaffirms Rhyolite Ridge as a highly attractive global Project to produce lithium carbonate, lithium hydroxide and boric acid. The updated findings position Ioneer, on an LCE basis, in the lowest cost quartile for lithium production globally with an estimated all-in sustaining cash cost to produce battery grade lithium hydroxide of US$5,745 and a cash cost of C1 $3,858 per tonne net of expected boric acid revenue in the first 25 years.

The Project has a stable overall operating cost structure to produce lithium carbonate and battery grade lithium hydroxide due to the scale and reliability of its boric acid credit. Boron remains one of the most stable natural resource commodities over many decades.

Ioneer has refined Project plans over the past four years and updates now include an Association for the Advancement of Cost Engineering (AACE) Class 2 capital cost estimate (-10%, +15%) with approximately 70% of the Project’s engineering complete. As a result of this and other engineering work including RAM analysis and detailed engineering design, Ioneer has adopted a more conservative approach to plant availability, equipment downtime and maintenance strategies. While this approach reduces bottom line economics, the Company believes it is appropriate for a Project of this type and scale.

The Company now estimates total capital expenditure to complete the Project will be US$1,667.9 million, including a 10% contingency.

Click here for the full ASX Release

This post appeared first on investingnews.com
previous post
Cardiex Receives TGA Approval for CONNEQT Pulse Device
next post
Blue Lagoon’s Dome Mountain Joins BC’s Select List of Permitted Projects

You may also like

Silver Price Surges to US$36, Marking 13 Year...

June 5, 2025

Auto Industry Takes Hit as China’s Rare Earths...

June 5, 2025

Retraction of Lo Herma Scoping Study Statements

June 5, 2025

Shein and Temu see U.S. demand plunge as...

June 5, 2025

Metals Focus: Gold to Average US$3,210 in 2025...

June 5, 2025

Prismo Metals Appoints Gordon Aldcorn as President

June 5, 2025

This California startup is cleaning water and removing...

June 5, 2025

Crypto Market Recap: DePIN Market expected to soar,...

June 5, 2025

Premier American Uranium to Acquire Nuclear Fuels, Creating...

June 5, 2025

Hempalta Announces Participation in the 2025 Canadian Climate...

June 5, 2025
Join The Exclusive Subscription Today And Get Premium Articles For Free

    Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!

    Recent Posts

    • Three Charts Showing Proper Moving Average Alignment
    • Clusters of Long Winning Streaks: What They’re Telling Us
    • Silver Price Surges to US$36, Marking 13 Year High
    • Auto Industry Takes Hit as China’s Rare Earths Export Controls Impact Supply Chains
    • Retraction of Lo Herma Scoping Study Statements
    • About Us
    • Contacts
    • Email Whitelisting
    • Privacy Policy
    • Terms and Conditions

    Copyright © 2024 GetFinancialSolutions.com All Rights Reserved.

    GetFinancialSolutions.com
    • Investing News
    • Stock News
    • World News
    • Business News